Hale Centre Theatre

Project Summary

The biggest coordination effort was the Tait Stage. One of the most intricate stages in North America with 47 moving parts using more than 120 motors. Our challenge was coordinating with the Tait Stage Technology Team and provide all the power requirements needed in the right place. Tait has provided stages for top performers and theatres around the world.

The stage has 8 Vomitory Lifts, 1 front and 1 back lift per quadrant – each independently controlled, 1 ft per second speed. Raises above and drops below the stage level with a total of 20 feet of movement.

Client:

Awards:

Intermountain Electrical Industry Awards Project of the Year – 2017 

Completion:

Services Provided:

Acoustical Design, Architectural Lighting, Audiovisual Design, Electrical Engineering, ICT Engineering, Safety and Security Design and Training (HB84) 
Resolut
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.